This section includes guidelines and requirements applicable to critical lifts and describes the planning and documentation required to perform a critical lift.
29 CFR 1926, SUBPART N
ANSI/ASME B-30.7 SERIES
• Make determinations of critical lifts
• Provide supervisor & employee training
• Provide safe and proper equipment for critical lifts
• Provide inspection procedures
• Follow guidelines and inspection procedures
• Supervise all critical lifts
• Ensure employees have adequate operational knowledge & experience
• Immediately remove from service any equipment that fails inspection
• Follow lifting & rigging procedures
• Immediately report any problems with equipment of procedures
• Not attempt any critical lifts unless authorized & approved
The decision to designate a lift as a critical lift is a management decision. Guidelines provided here are intended to aid in making that decision. A lift should be designated as a critical lift if dropping, upset or collision could cause or result in any one of the following:
1. Damage that would result in serious economic consequences.
2. Damage that would result in unacceptable delay to schedule or other significant deleterious programmatic impact (such as loss of vital data)
3. Undetectable damage that would jeopardize future operations or safety of a facility.
4. Significant release of radioactive or other hazardous material to the environment or creation of an undesirable condition.
5. Personnel injury or significant adverse health impact, either onsite or offsite.
6. In addition, a lift that meets one of the following criteria shall be designated as a critical lift:
a. Any lift that requires the use of multiple cranes.
b. Any lift that exceeds 80% of the crane’s rated capacity within the lift configuration of the crane.
c. The item to be lifted requires exceptional care in handling because of size, weight, close-tolerance installation, high susceptibility to damage or other unusual factor.
d. The item, although non-critical, requires exceptional care in handling because it is being lifted above a critical item.
The manager who has the responsibility for the item being lifted has the authority to require that it be handled as a critical lift. In addition, the manager at the facility where the lift will be performed also has the authority to require that it be handled as a critical lift. The manager who designates the lift as a critical lift shall ensure that a person-in-charge (PIC) is assigned. (The PIC need not be in the manager’s organization).
The PIC shall ensure that a step-by-step procedure is prepared for critical lifts. Although individual procedures are prepared for one-time critical lifts, general procedures may be employed to accomplish routine recurrent critical lifts, For example, a general procedure may be used to lift an item or series of similar items that are frequently lifted or repeatedly handled in the same manner. A critical lift procedure should contain the following, as applicable:
• Identify the items to be moved.
• Special precautions, if any (such as outrigger or track cribbing for mobile cranes).
• Weight of the item and total weight of the load (For mobile cranes, see the manufacturer’s instructions regarding components and attachments that must be considered as part of the load).
• Center of gravity location.
• A list of each piece of equipment (e.g., crane, hoist, fork truck), accessory, and rigging component (e.g., slings, shackles, spreader bars, yokes) to be used for the lift. (This list shall identify each piece of equipment by type and rated capacity).
• Designated checkpoints and holdpoints and estimated instrument readings, as relevant, so that job progress can be checked against the plan.
NOTE: Sign-offs in the procedure are generally appropriate. For example, initial and time/date the procedure as key steps are completed. Hold points or sign-off points should be provided for personnel assigned to witness the work.
• Rigging sketch(s), which include the following:
• Lift point identification.
• Method(s) of attachment.
• Load vectors.
• Sling angles.
• Accessories used.
• Other factors affecting the equipment capacity.
• Rated capacity of equipment in the configuration(s) in which it will be used. (For mobile cranes, many factors affect rated capacity, including boom length, boom angle and work area).
• A load-path sketch that shows the load path and height at key points in the job. (For lifts with mobile cranes, include the crane position(s) relative to the load and relative to surrounding obstructions. Where appropriate, include floor-loading diagrams).
• A sketch indicating lifting and travel speed limitations. (This may be noted on the load path sketch or on a separate sketch).
• A sign-off sheet to verify that equipment and tackle inspections or tests are current.
• Rigging sketch(s), which include the following:
• Lift point identification.
• Method(s) of attachment.
• Load vectors.
• Sling angles.
• Accessories used.
• Other factors affecting the equipment capacity.
• Rated capacity of equipment in the configuration(s) in which it will be used. (For mobile cranes, many factors affect rated capacity, including boom length, boom angle and work area).
• A load-path sketch that shows the load path and height at key points in the job. (For lifts with mobile cranes, include the crane position(s) relative to the load and relative to surrounding obstructions. Where appropriate, include floor-loading diagrams).
• A sketch indicating lifting and travel speed limitations. (This may be noted on the load path sketch or on a separate sketch).
• A sign-off sheet to verify that equipment and tackle inspections or tests are current.
NOTE: Practice lifts are recommended. (If used, requirements for the practice lift should be documented in the procedure).
The critical lift procedure should be approved as required by the responsible contractor’s procedures. In the absence of direction from the contractor’s procedures, a critical lift procedure shall be approved (signed and dated) by the following:
GET INSTANT ACCESS
to THE MEMBERS LIBRARY
Safety materials created by safety professionals.
Access to the Safety Manager software.
Wide variety of safety videos and courses.
**Brand New** Safety Training Management System
Pre-Made Safety Materials Ready For Use
Created by experienced safety professionals & risk consultants. Saving you time, money, and risk of injuries.
95% of the work already done.
Below are the maximum penalty amounts, with the annual adjustment for inflation, that may be assessed after Jan. 15, 2024. (See OSHA Memo, Jan. 8, 2024).
**New OSHA HEAT 90 DAY**
>>Download Free HERE<<
**New 2024 OSHA 300 Form**
>>Download Free HERE<<
**Brand New**
Free with full membership subscription
Training LMS System
Ask The Safety Consultant
Safety Equipment Deal Finder
Note: You must have a full subscription to the Safety Library in order to use this material. Any use outside of your organization, for resell, or without an active membership is strictly prohibited and may result in prosecution under copyright infringement laws. Please contact us first, if you would be interested in reselling or using our materials for reproduction.
Inside the Members Library
Topic Index
Accident Prevention
Air Quality
Asbestos
Bloodborne Pathogens
Boilers
Chemical Safety
Compressed Gas
Confined Space
Construction
Construction Worksite
Cranes & Slings
Driver / Fleet Safety
Drug Free Workplace
Electrical
Emergency Management
Engineering Safety
Environmental
Equipment
Ergonomics
Fall Protection
Fire Safety & Prevention
First Aid
Flammable Materials
Forklifts
Hazard Communication
Hazardous Materials
Hearing Protection
Heat Stress
Hot Work
Housekeeping
Job Safety Analysis
Laboratory
Ladders
Lead
Lockout-Tagout
Machinery & Equipment
Material Handling
MSDS (SDS)
Medical & First Aid
Occupational Health
Office Safety
Off the Job Safety
Personal Protection
Process Safety
Record Keeping
Respiratory Protection
Silica Safety
Rules & Policies
Signs & Labels
Slips, Trips & Fall
Training
Terrorism Programs
Tool Safety
Vehicle & Driver
Violence Programs
Welding & Hot Work
Training Videos
Library Index
Training Materials
Videos/Courses
Talks
Articles
PowerPoint
Handouts
Training Overheads
Quizzes
Supervisor Briefs
Management Briefs
Safety Sessions
2 Minute OSHA Safety Talks
Pamphlets
First Aid Training
Supervisor Training
Hazardous Materials
Bomb Threat
Crossword Puzzles
Biological Agents
Forms & Documents
Forms
Checklists
Audit Guides
Inspections Guides
Signs & Labels
Environmental Audit Guides
Recordkeeping - OSHA 300
Sign & Label Maker
Safety Management Resources
Safety Manuals/Written Programs
Ergonomic Programs
Emergency Plans
Process Safety Management
Construction Safety
Occupational Health
Environmental
Topic Sheets
DOT Fleet-Driver
Hazardous Materials
Chemical Safety
Drug Free Workplace
Terrorism Programs
Development Guides
Safety Manager Software
Safety References & Graphics
Technical Safety Information
Posters
Topic & Fact Sheets
Development Information
Job Specific Safety Rules
Terrorism
Calculators
Safety Comic Strips
New Safety Training System
Schedule and train your employees with our materials. Add unlimited amount of employees. Record all progress and issue certificates. For group and individual training sessions.
Typically replies within a day